Gulf Marine performed proof load testing and certification of 300 ton offshore crane using water bags and load cell.
Gulf Marine performed EMAG inspection of 5000 ton Offshore crane wire. Inspection was conducted on Main, Auxiliary, Wipe and Boom Host. .














Gulf Marine has performed complete 3D laser scanning of 3.5km2 machinery tunnel facility in UAE and prepared as-built 3D model of whole facility together with asset tagging.

Gulf Marine performed engineering for Loadout and Sea Transportation of East Anglia Wind Farm Jackets of Scottish Power which were constructed in UAE and transported to UK.

Gulf Marine completed the document review and marine warranty surveys for the loading, transportation and installation of 19 jackets and related boat landing platforms in SFNY, MRJN, HSBH, ZULF & BRRI fields as part of marine potential facilities long term agreement of Saudi Aramco

Gulf Marine scope include concept development, FEED, basic and detailed design of an offshore accommodation and training platform with jacket substructure in UAE waters

Gulf Marine has completed newbuild design of the self elevating unit "SEP Samrat" which functions as a pile installation and pile testing unit.

Gulf Marine completed the life extension studies for the drilling and production platforms in Nigeria Offshore. The engineering study included the structural assessment of as-is condition of the platforms and estimation of life based on fatigue analysis..

Gulf Marine provided engineering support for the upgrade of the rig for operating in deeper waters in Caspian Sea while retaining the VDL capacity.

Gulf Marine completed the detailed condition survey of MOPU Sapar Mayrat in Turkmenistan for assessment of structure, machinery and jacking system.

Gulf Marine performed the complete engineering for conversion of a tanker to "FSO Prem Pride" operated in India offshore for British Gas. The FSO unit had additional accommodation, offloading/bow loading systems, tandem mooring facilities along with storage facilities.

Gulf Marine did the complete engineering for the conversion of a Ro-Ro vessel to a cable laying ship, "CS Maram" operated by UAE entity. The converted ship had increase in hull dimensions, new cable tanks, new cable lay facilities etc..

Gulf Marine has completed newbuild design of the liftboatt "Aquarise III" which functions as an accommodation and offshore support unit.

Gulf Marine performed engineering for Loadout and Sea Transportation of the Shell’s Prelude FLNG turret modules weighing more than 10,000 MT, which were constructed in UAE and transported to South Korea.

Gulf Marine performed the complete engineering for conversion of the offshore supply vessel to a well stimulation vessel. The vessel was converted in UAE and were fitted with well stimulation equipment, tanks and associated systems.

Gulf Marine did the engineering analysis and subsea simulation for the installation in multiple stages of umbilical cables for Marjan field of Saudi Aramco

Gulf Marine has performed engineering for more than 350 projects for scrubber system retrofits which includes 3D scanning, feasibility studies, basic design, detail design, project management support, installation support and equipment supply for various clients around the globe.

Gulf Marine has performed engineering for more than 700 projects for ballast water treatment system retrofits which includes 3D scanning, feasibility studies, basic design, detail design, project management support, installation support and equipment supply for various clients around the globe.

Gulf Marine completed the life extension studies for the drilling and production platforms at Qatar offshore. The engineering study included the structural assessment of as-is condition of the platforms and estimation of life based on fatigue analysis..

Gulf Marine performed the review and approval of engineering drawings and calculations on behalf of owners for Adnoc’s “Rig Diyina” RIAP project in UAE.

Gulf Marine scope included the design for damage repair using grouting clamps and engineering assessment including geotechnical and ultimate strength analysis for a berthing dolphin at Adnoc LNG jetty site.

Gulf Marine acted as owners representative for supervision of newbuild construction of 3nos AHTS vessels constructed in China and India.